We handle the permits. You deal with us, not the city.
We take your ADU, garage conversion or remodel through the city for you: plans, plan check, corrections and every inspection.
- 5.0 on Google
- CSLB #1149710
- Licensed, bonded and insured

Foundation ready for inspection on one of our ADU builds
What does it mean that we handle the permits?
It means the permit work is our job, from the first plan to the final inspection. Remodel Group LA prepares the plans, submits them to the city, answers plan check corrections, and schedules and meets every inspection for your ADU, garage conversion or remodel. You approve the design and make the choices; we deal with the city.
What does the permit path look like on your own?
Eight stops, several offices, and a different person to chase at each one. This is what a homeowner faces without a team.
- Zoning checkWhat your lot is allowed to have, before anything is drawn.
- Plans and engineeringThe drawings and calculations the city needs to review.
- Plan check submittalHanding the plans to the city and starting the review.
- CorrectionsThe city's list of changes it wants made to the plans.
- Re-submittalCorrected plans go back, sometimes more than once.
- Utility sign-offsClearances from the agencies and utilities involved.
- Each inspectionAn inspector checks the work at every stage of the build.
- Final sign-offThe last inspection. The work is approved and on record.
What exactly do we handle?
Everything between your idea and the inspector’s last signature. You approve the design and make the choices. We do the paperwork and the waiting.
City permit fees are separate from our price. Everything on this list is our work.
- Checking what your lot allowsWe look at zoning and the site before we design.
- Design and plansThe drawings the city reviews, prepared as part of our work.
- EngineeringStructural calculations when the project calls for them.
- Submitting to the cityWe file the application and the plans.
- Plan check correctionsWe answer the city’s comments and resubmit.
- Agency and utility clearancesWe get the sign-offs the permit depends on.
- Pulling the permitAs the licensed contractor, the permit is in our name.
- Scheduling inspectionsWe book each inspection at the right stage.
- Meeting the inspectorWe are on site for every inspection, so you do not have to be.
- Final sign-offWe close the permit when the work passes.
How are you protected?
You pay by construction milestone, not a big sum up front, and our workmanship is covered for a year after we finish.
-
We meet the inspector
-
We book each inspection at the right stage, are on site for it, and schedule any re-inspection.
-
1-year workmanship warranty
-
Our workmanship is covered for a year after we finish.
-
A line-by-line proposal
-
What is included and what is not, line by line, before you sign. Any change is approved by you in writing before the work is done.
-
A deposit within the legal limit
-
Any deposit stays within California’s legal limit for home improvement contracts: $1,000 or 10% of the contract price, whichever is less.
What happens when you skip permits?
Unpermitted work can look cheaper and faster at the start. These are the ways it tends to cost more later.
-
The job can be stopped
A building department can order work to stop on a project that has no permit, until the permit is sorted out. to verify
-
Finished work may have to be opened up
To approve work after the fact, an inspector may need to see inside walls, floors and ceilings that are already closed. to verify
-
Selling or refinancing gets harder
Unpermitted work can come up when a buyer, an appraiser or a lender looks at the property.
-
Insurance may not cover it
An insurer may question a claim that involves work done without a permit. to verify
-
An unpermitted unit is not a legal rental
A garage or unit converted without permits is generally not recognized as a legal dwelling to rent out. to verify
“They basically handled everything from design to permits to construction.”
Linda Zuspan, ADU project. Google review.
Permit questions, answered.
If yours isn’t here, call us. A person answers.
Do I need a permit for a kitchen or bathroom remodel?
Usually yes, when the work changes plumbing, electrical, gas, walls or the layout of the room. Purely cosmetic work, such as painting or replacing finishes, often does not need one. At the free assessment we tell you which parts of your project need a permit.
to verify
Who pulls the permit, the contractor or the homeowner?
We do. As your licensed contractor we apply for the permit and handle the plan check, corrections and inspections. A homeowner can apply as an owner-builder, but then the homeowner takes on the permit and the inspections.
What is plan check?
Plan check is the city’s review of your drawings before it issues a permit. A plan checker compares the plans with the building and zoning codes and sends back a list of corrections. We answer the corrections and resubmit until the plans are approved.
What happens at an inspection?
A city inspector visits at set stages of the build, such as foundation, framing, electrical, plumbing and insulation, and again at the end. The inspector checks that the work matches the approved plans and the code, then signs off so the next stage can start. We schedule each inspection and meet the inspector on site.
How long can ADU permit review take?
California law gives a city 15 business days to say whether an ADU application is complete, then 60 days to approve or deny a complete application when there is already a house on the lot (Cal. Gov. Code §66317). Corrections can add time, so we do not promise a date. What we control is submitting complete plans and answering corrections quickly.
What is a stop-work order?
It is a notice from the building department that construction has to stop, usually because work is being done without a permit or does not match the approved plans. Work cannot continue until the problem is resolved with the city.
to verify
Are permit fees included in your price?
No. City permit fees are paid by you directly to the city. Our proposal covers all of the permit work: plans, submittal, plan check corrections, and scheduling and meeting every inspection.
Do permits raise my property taxes?
A permit is not a tax. When a permit covers new construction, such as an ADU or an addition, that new construction is generally assessed and added to the property’s value, while the existing house keeps its current assessment. Repairs and like-for-like replacements are generally not reassessed.
to verify
What happens if an inspection fails?
The inspector writes down what has to be corrected, and the work is inspected again once it is fixed. We schedule the re-inspection and meet the inspector again.
Can you legalize existing unpermitted work?
No. We pull permits only for the projects we design and build, so we do not take on legalizing existing work by itself. If you are planning a new ADU, garage conversion or remodel with us, we handle the permits for that project from start to finish.