Roofing in Los Angeles
A new roof, on its own or as part of a remodel. We handle the permits, you pay by milestone, and financing is available.
Real footage from one of our builds, including the new roof
Get my free assessment- 5.0 on Google
- CSLB #1149710
- Licensed, bonded and insured
Last updated:
What roofing work do we do?
We replace and repair roofs on houses, either as a job of its own or as part of a remodel or an ADU. Remodel Group LA is a licensed general building contractor in West Hills (CSLB #1149710) that works across Los Angeles. One team handles the roof, the permits where they are needed, and the inspection.
What do you get?
-
A roof you do not think about
Installed to shed water and last.
-
One contractor
The same company can handle the roof and anything under it.
-
The city handled for you
Where permits are needed, we deal with them.
-
Work that is backed
A 1-year workmanship warranty on what we build.
What does roofing work include?
From one leak to a full replacement.
- Roof replacementThe old roof comes off and a new one goes on.
- RepairsLeaks, damaged sections and flashing.
- Shingle roofsComposition shingles, the most common roof on Valley homes.
- Other roof typesTile and low-slope roofs. Ask us about yours.
- Flashing, vents and guttersThe details that keep water out.
- Roofs for remodels and ADUsBuilt as part of a larger project.
Do I need a permit to replace my roof?
Generally, yes. A full roof replacement usually needs a permit and an inspection. Small repairs may not. to verify
We handle the permits, from the application to the final inspection.
-
We tell you what needs a permitAt the free assessment, before you commit to anything.
-
Plans and submittalWe prepare what the city needs and file it.
-
CorrectionsWhen the city asks for changes, we make them and resubmit.
-
InspectionsWe schedule every inspection and meet the inspector on site.
You pay by milestone, not a big sum up front.
You pay as each stage of the work is done. Our workmanship is covered for a year after we finish.
How does a roof replacement work in 4 steps?
One team carries the project the whole way.
-
Call and free visit
We call you back within 5 minutes during business hours, then visit your home the same day or the next business day. We check the roof’s condition and tell you whether it needs repair or replacement.
-
A line-by-line proposal
Usually the same or the next business day: the roof type, the material and what the work covers, each on its own line, with what’s included, what’s not and your payment milestones in writing.
-
Scope and permit
We agree the roof type, the material and the scope. Where a permit is needed, we pull it and meet the inspector. City permit fees are paid by you directly to the city.
-
Build and final walkthrough
Licensed subcontractors remove the old roof, install the new one and clean up under our management. You pay by milestone, and any change is approved by you in writing first. We walk through the finished roof with you, and our workmanship is covered for a year.
Roofing projects go here.
Reserved for your own project photos. Nothing generated will be shown in this section.
Your project photoThe roof, before
-
Project name
-
City, scope
Your project photoDuring the work
-
Project name
-
City, scope
Your project photoThe finished roof
-
Project name
-
City, scope
Mockup note: placeholders until the owner’s photos arrive.
What do clients say?
“They were very nice, very professional, and they cleaned up”
Willie Flowers. Google review.
Roofing questions, answered.
If yours isn’t here, call us. A person answers.
Do I need a permit to replace my roof?
Generally, yes. A full roof replacement usually needs a permit and an inspection, and small repairs may not. We tell you at the free assessment, and we handle the permit.
to verify
How long does a roof replacement take?
It depends on the scope, the materials you choose and, when permits are needed, on the city. We do not promise a date before we have seen the space. We usually visit the same day you call, the next business day at the latest, and your line-by-line proposal usually follows the same or the next business day. With it, we tell you what to expect for a project like yours.
Can I stay home while the roof is replaced?
Usually, yes. It is noisy while we work, and we protect the areas around the house and clean up at the end of each day.
How much does a roof replacement cost?
We don’t publish prices, because the cost depends on your home, the scope and the finishes you choose. After your free assessment you get a line-by-line proposal that lists what is included and what is not. City permit fees are paid by you directly to the city. Any change is approved by you in writing before the work is done.
Is financing available?
Yes. Financing is available through several third-party lenders, subject to credit approval. Ask about it when we call or at your free assessment.
What does the free assessment include?
We come to your home, usually the same day you call, the next business day at the latest. We look at the space, talk through what you want and explain your options, including financing and milestone payments. Your line-by-line proposal usually follows the same or the next business day. There is no charge and no obligation.
Start with a free assessment of your roof.
Tell us about your project. We call you back within 5 minutes during business hours and set a time to come see your home.
Prefer to talk now?(310) 879-9990
