(310) 879-9990

Got it. We’ll call you within 5 minutes during business hours.

Our hours: Mon to Fri 8am to 7pm, Sun 9am to 6pm. Outside them, we’ll call first thing when we open.

Prefer to talk now? (310) 879-9990. Save the number so you know it’s us when we call.

What happens next

  1. Call and free visitWe call you back within 5 minutes during business hours, then visit your property the same day or the next business day. We see what your lot allows and go over your options.
  2. A line-by-line proposalUsually the same or the next business day: design, plans, permit work and the build, each on its own line, with what’s included, what’s not and your payment milestones in writing.
  3. Design and permitsSign the build contract, and design, planning and 3D are included. We prepare the plans, submit them, answer plan check and meet every inspection. City permit fees are paid by you directly to the city.
  4. Build and keysLicensed subcontractors build under our management. You pay by milestone, and any change is approved by you in writing first. A typical ADU build takes 3 to 4 months once construction starts. Our workmanship is covered for a year.

Good to have ready for the visit

  1. A rough idea of what you wantRental, family or office, and roughly how big.
  2. Access to the yardSo we can look at the space and the connections.
  3. Any plans or surveys you haveOnly if you already have them.
  4. Your questions about cost and paymentsA rough budget, and whether you want to see your monthly payment options. We go through financing, the line-by-line proposal and the milestone payments with you.

5.0
on Google, 6 reviews

Read our reviews on Google